The Joint Utilities have provided the following user demo as an additional reference to help guide users through the Stage 3 hosting capacity displays. More information on the analysis criteria, assumptions, FAQs and relevant background can be found in this presentation. Each circuit’s hosting capacity is determined by evaluating the potential for power system criteria violations as a result of large PV solar systems interconnecting to three phase distribution lines with an AC nameplate rating greater than or equal to 300 kW interconnecting to three phase distribution lines. The most recent release, Stage 3, of the Hosting Capacity displays now includes sub-feeder level analysis of large-scale solar PV systems interconnecting to distribution circuits. The Joint Utilities, with guidance from stakeholders in the 2016 engagement group discussions, have developed a four staged Hosting Capacity implementation roadmap. During the session, the Joint Utilities provided an overview of the current capabilities of the Battery Storage HC Maps, shared plans for the future of the HC Maps, and welcomed stakeholder feedback! Thank you for continuing to engage and collaborate with us. The Joint Utilities held a stakeholder session to discuss stage the HC roadmap on NovemClick HERE to view the slide deck. The minimum level of the minimum HC calculated appears on the draw-down pop-up, along with the following information. The storage HC Maps have separate displays for load and generation and are color-coded based on the minimum level of the maximum HC calculated for the feeder. At this time, the Storage HC Map showed feeder-level hosting capacity (min/max), additional system data, downloadable feeder-level summary data, sub-transmission lines available for interconnection, and reflects existing DER in circuit load curves and allocations. Storage HC data made available via the APIĪs part of stage 3.5 of the Roadmap, the JU published and initial iteration of the Storage HC Maps in spring 2022.Links and/or instructions to access 8760 data.Six-month update for circuits that increase in DG > 500kW on PV and Storage Maps.The JU is also providing the following information. Cost Share 2.0 Items on PV and Storage Maps.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |